Our Work

No two ever alike. All built the same way.

A finished room tells you how good the photographer was. This page shows you the stages where the quality is still visible — excavation, waterproofing, framing, structure, mechanical — because that is where a house is actually won or lost. We document every home we build this way, every week, and you get all of it.

The through-line

We don't have a house style. We have a standard.

Crisp and modern, warm and traditional, mountain-modern in the foothills — the look changes with every family. What never changes is the obsession with materials, light, structure, and detail. A portfolio can show you what a builder made once. What follows is how we make it, every time.

What the standard actually is

Three things you can verify before you hire us

The bench

The house is built by the trades, not by a logo. Ours were assembled over twenty years on the Front Range, and we'll give you their names and numbers so you can call them yourself before you sign anything.

Framing · Masonry
Millwork & cabinetry
Structural steel
Timber & truss
Plaster & finish
Mechanical & radiant

The specification

We build a written, line-by-line specification before pricing — not a page of allowances. You'll see the exact windows, the exact stone, the exact hardware, and what each one costs.

Photography scheduled
Our material library: quartersawn oak, honed stone, unlacquered brass, hand-troweled plaster.
September 2026

The number

Real numbers in your first session, then a fixed itemized bid built from actual vendor quotes. It does not move unless you move it. If a selection changes the number, you see it change the week it happens.

In production
Sample budget worksheet and specification page, redacted — downloadable.
September 2026
One house, start to finish

Most builders show you the last day.
Here is every day before it.

A finished room photographed well tells you almost nothing about who built it. So instead of a gallery, here is one house in the order it actually happened — bare ground, excavation, foundation, waterproofing, framing, walls going up by hand, structure set overhead. Judge the work at the stages where the work is still visible.

Built and photographed by Steve Combs. Every Sanctuary residence is documented exactly this way, from week zero forward.

Four workers holding a newly raised framed wall upright on a building deck, red rock formations visible through the window opening
The moment a set of drawings becomes a room you can stand in. That rock formation through the window opening is the reason the wall is where it is.
01

Reading the land before drawing anything

The lot was scrub oak on a slope, much of it standing burnt. Where a house sits on ground like this decides the budget more than any finish selection will — so the first work is walking it, staking it, and finding the one position that gets the views without fighting the grade.

A family standing on a freshly staked building site among burnt scrub oak, red rock formations beyond
Staked out — with the people it was for
A cleared building envelope on a sloping lot, red rock formations in the distance
Envelope cleared
02

Cutting into the grade

A walkout level cut into a slope is the difference between a house that sits on the hill and a house that sits on top of it. It is also where foothills budgets get away from people: rock, over-excavation, and haul-off are all discovered here, not estimated here.

Open excavation cut into a sloping site, benched walls of red soil
Excavation and benching
Concrete pump truck positioned on a narrow wooded access, boom extended over the foundation
Concrete placed by pump
03

Foundations, formed and squared

Everything above this is only as true as this is. Walls formed, braced, and checked square before a single pour — because nothing here can be corrected later without correcting everything.

Foundation wall forms set and braced, excavated spoils piled behind
Walls formed
Formed foundation walls with the valley and treeline beyond
Squared and checked
04

The part you will never see again

Damproofing carried down the full wall, then free-draining gravel against it and a drain at the footing. It takes an extra day and it is invisible forever. It is also the single most common thing to find missing when someone calls about a wet basement fifteen years on.

Foundation wall coated in damproofing with drainage gravel placed against it
Sealed, drained, backfilled
05

Deck on, and the house starts to exist

First walls up off a finished deck. From here the drawings stop being drawings.

Foundation complete with the first framed walls standing on a finished deck
First walls
06

Raising walls the old way

Framed flat on the deck, then stood up by hand. Four people, a wall, and a count to three. There is machinery that will do this faster and there are days when doing it this way is simply better.

Four workers bent over a framed wall lying flat on the deck, preparing to lift
Lift
The framed wall part-way up as the crew walks it upright
Walk it up
Interior framing complete with stacked lumber on the deck
Stand and brace
07

Openings placed for what is actually out there

Every opening in this house was set against a specific thing worth looking at. That is a decision made at framing with a tape measure and a level, not one you can retrofit with bigger glass later.

A framed window opening looking out across a ridge and treeline
Framed to the view
Framed stair opening with daylight falling down through the structure
Stair opening
08

Structure set overhead

Ridge timbers and beams craned into place. Structural members doing structural work — sized for the load they carry, not applied afterward to look as though they do.

Ridge timbers meeting against open blue sky with a crane boom behind
Ridge set
Sheathed exterior wall standing with a crane boom rising behind it
Craned in
09

The systems, before anything covers them

A hydronic manifold wall, laid out so every zone is labelled, isolated, and reachable by someone who is not the person who built it. Mechanical rooms are where a builder’s real standards show, because nobody is ever going to photograph one for a magazine.

A mechanical room wall of copper manifolds, circulators and gauges serving multiple radiant heating zones
Hydronic manifolds and zone pumps
View up into an open floor system showing coordinated plumbing, wiring and ductwork between engineered joists
Rough-in coordinated overhead
10

Waterproofed long before it was beautiful

A shower is a water containment assembly with tile glued to the front of it. The membrane behind that tile is the entire difference between a bathroom and a future insurance claim — and it is the one layer no client ever gets to inspect.

Shower walls coated in red waterproofing membrane over cement board, with the first accent tile band and mosaic floor set
Membrane on, first band set
The same shower with wall and floor tile complete
Same wall, finished
11

A roof chosen for where the house actually sits

Concrete tile, Class A rated, on a house surrounded by scrub oak that had already burned once. The selection happened standing in the supplier’s yard looking at full-size boards in daylight, not at a two-inch chip on a kitchen table.

Finished concrete tile roof with solar thermal panels, red rock formations visible beyond the house
Installed — Class A over a burn scar
12

Surfaces laid, not simply installed

Plank flooring racked out across the room first so the colour variation is distributed on purpose rather than in the order the bundles happened to open. It costs an hour. It is the difference between a floor and a patchwork.

Hardwood plank flooring being laid, loose planks racked out ahead of the installer
Racked out before nailing
Close view of a hand running a sprayer along a finished drywall corner
Finish coats, by hand
Three tradespeople setting a light fixture while plank flooring acclimates stacked on the floor below
Flooring acclimating, fixtures set
13

The parts a family puts their hands on every day

Stair rail, newels, and treads dry-fit in raw wood first, adjusted, and only then finished. Handrail height and the feel of a newel under a palm are not drawing decisions. They get settled on site, standing on the stair.

Stair handrail and newel post dry-fitted in unfinished wood
Dry-fit in raw wood
The completed stair with finished newels, iron balusters and hardwood treads
Finished and set
14

Openings, ground, and the way in

Arched openings framed and floated square, stone carried down to grade, and flatwork poured to fall away from the house. The last ten per cent is where most of the arguing happens on most jobs, which is exactly why it belongs in the schedule from day one.

Interior arched openings and a window bay at the drywall stage, light falling across the floor
Arches floated square
Stone veneer carried down to grade beside a broom-finished concrete drive and a stacked retaining wall
Stone to grade, water sent away
The house at dusk under a red sunset, still under construction, set into a foothills hillside with the plains beyond
The same house, near the end. Every photograph in this section is one build, in the order it happened — because a single house shown honestly from staked dirt to dusk tells you more about how someone works than twenty finished rooms from twenty different jobs.
The finish work

And the details, once it is finished.

Built by Steve Combs for his own family — the clearest answer there is to what he does when the only person he has to satisfy is himself.

Coffered beam ceiling under construction, beams set as structural members before finish
Beams set as structure, not glued on after. The ceiling was framed to hold the load it appears to hold.
Welding structural steel on site at dusk, sparks falling against a foothills treeline
Steel welded on site at dusk. Steve has always done the work he asks his trades to do.
Close detail of a brass and crystal light fixture
A fixture chosen, not specified from a catalog page. The small decisions are where a house stops feeling generic.
Stained timber beams forming a finished coffered ceiling
The same beam work, finished. Structure that had already done its job long before anyone saw it.
Entry hall with a stained wood plank ceiling above travertine flooring
A plank ceiling over an entry, because the first ceiling you walk under sets the tone for every one after it.
Documented from day one

Watch a home get built instead of reading about one.

Most builders show you the ending. We're going to show you the whole thing. Steve holds an FAA Part 107 remote pilot certificate and our photography is handled in-house by a working professional photographer — so every Sanctuary residence gets flown and shot on a weekly cadence, from the raw lot to the final walk-through.

  • Week zeroAerial site survey of the lot before a single tree comes down.
  • Excavation & foundationSame-angle aerial every week, so progress is measurable, not anecdotal.
  • Framing & structureThe parts that get covered up forever — documented while you can still see them.
  • Rough-in & insulationMechanical, radiant, and envelope work photographed before drywall.
  • Finish & deliveryFull professional interior and exterior shoot, published with the owner's written permission.
Aerial — week zero
First flight over lot one.
Framing
Structure, before it disappears.
Craft detail
Joinery and hand-set stone.
Delivered
The finished residence.
In the meantime

You don't have to take our word for it.

A new company can't hand you a gallery. It can hand you people who will vouch for the work — and that's a harder thing to fake than a photograph. Ask us for any of these and you'll have them the same day.

Trade partner references Supplier & lender references Personal client references License & insurance certificates Sample specification Sample schedule

“From the very beginning, Steve was personally invested in our project and treated our home as if it were his own. His knowledge of every aspect of construction gave us confidence throughout the building process.”

— Gary and Lynn Waring

Written for Steve directly and shared with his permission. It speaks to Steve as the builder who led the project — not to a Sanctuary Homes project. Read the full letter.

And if you want to see finished work in person before you commit: we'll walk any Front Range home you're considering with you, or meet you at a Parade of Homes tour and talk honestly about what's well built and what isn't.

Ready to be the first?

The next Sanctuary home is the one we haven't built yet — yours. Tell us about your lot, your vision, and how you want to live.

Start your project